Collyweston Storage Building

Project for the provision of a new storage building

 

Project Description

  • Excavation to formation levels
  • Construction of a reinforced foundation with a 450mm high concrete plinth
  • Installation of the steel portal frame to the foundations
  • Installation of cladding rails
  • Cladding the the new building
  • Installation of down pipes and drainage chamber
  • Installation of associated power and lighting
  • Relocation of a fuel container

 

Cairn Cross Civil Engineering 2021 | 1 Cadman Court, Leeds, LS27 0RX | Company Registration No. 03110217 | Company VAT No. 566 4194 17

Collyweston Storage Building

Project for the provision of a new storage building

Project Description

  • Excavation to formation levels
  • Construction of a reinforced foundation with a 450mm high concrete plinth
  • Installation of the steel portal frame to the foundations
  • Installation of cladding rails
  • Cladding the the new building
  • Installation of down pipes and drainage chamber
  • Installation of associated power and lighting
  • Relocation of a fuel container