Services | Pollution Control

Crofton Fuel Bund

Project for the provision of a fuel off-load area and installation of non-potable water tanks

 

Project Description

  • Strip ad removal of the existing 20,000 litre tank and the waste oil tank
  • Electrical cabling, containment and interconnecting pipework works
  • Existing structure was broken out and removed from site
  • Installation of concrete manhole chambers
  • Installation of a storm water pump
  • New concrete slab and stub walls were formed
  • Relocation of metering and pipework
  • Installation of 8 new photocell controlled LED bulk head fittings and single LED over the offload area
  • Reinforced concrete was installed to house the new water tanks
  • Installation of 2 water tanks
  • Installation of Armco barriers
  • Installation of all associated pipework and lagging of any exposed pipework
  • Associated white lining works

 

 

Cairn Cross Civil Engineering 2021 | 1 Cadman Court, Leeds, LS27 0RX | Company Registration No. 03110217 | Company VAT No. 566 4194 17

Crofton Fuel Bund

Project for the provision of a fuel off-load area and installation of non-potable water tanks

Project Description

  • Strip ad removal of the existing 20,000 litre tank and the waste oil tank
  • Electrical cabling, containment and interconnecting pipework works
  • Existing structure was broken out and removed from site
  • Installation of concrete manhole chambers
  • Installation of a storm water pump
  • New concrete slab and stub walls were formed
  • Relocation of metering and pipework
  • Installation of 8 new photocell controlled LED bulk head fittings and single LED over the offload area
  • Reinforced concrete was installed to house the new water tanks
  • Installation of 2 water tanks
  • Installation of Armco barriers
  • Installation of all associated pipework and lagging of any exposed pipework
  • Associated white lining works