Stockport CET Installation

Design and build contract for the provision of a new CET system to facilitate depot train maintenance.

 

Project Description

  • New scuba tank installed in existing plant room
  • New reinforced concrete foundations were cast
  • Associated pipework
  • Installation of 8 new CET points
  • Service troughing
  • Services installation

 

Project Details

  £320,000

  Stockport

  Servicing new CAF trains

  AdBlue® System

 

 

Cairn Cross Civil Engineering 2021 | 1 Cadman Court, Leeds, LS27 0RX | Company Registration No. 03110217 | Company VAT No. 566 4194 17

Stockport CET Installation

Design and build contract for the provision of a new CET system to facilitate depot train maintenance.

Project Description

  • Removal of existing rail and rubble from site, along with other associated works to prepare ground for piles
  • Installation of CFA piles for pit & shed extension
  • Installation of driver platform foundations, adjacent to new sidings roads
  • Construction of new apron slabs, to building entrance & exit
  • Excavation & preparation for structural pit works
  • Reinforced concrete structural works, for pit & shed construction
  • Installation of steel frame building
  • Overhead monorail crane
  • Installation of depot protection system