Project Description

  • AFC designs were developed and submitted to the client
  • Installation of a new dividing wall to demarcate the lathe road from the adjacent wash road
  • Decommission and removal of existing equipment and wheel lathe
  • Excavation of concrete slab surrounding the sides of the pit and installation of propping system
  • Installation of reinforced concrete
  • Pumping arrangements were installed to remove any potential contaminated groundwater from the pit into existing drainage
  • Duct routes installed
  • Associated electrical works
  • A Frame heavy lift gantry crane installation
  • Installation of a new wheel lathe using a megalift system
  • Concrete floor painting works, grinding down of existing surface, 2 coats of non-slip floor paint with quartz sand were applied
  • Southern slab works; the existing slab was saw cut and broken out. A new blinding layer and steel reinforcements were installed. Insitu concrete was poured, cured and striked accordingly
  • These works were completed over two phases

 

 

Cairn Cross Civil Engineering 2021 | 1 Cadman Court, Leeds, LS27 0RX | Company Registration No. 03110217 | Company VAT No. 566 4194 17

Toton Wheel Lathe Installation

Installation of a replacement wheel lathe and associated electrical works.

Project Description

  • AFC designs were developed and submitted to the client
  • Installation of a new dividing wall to demarcate the lathe road from the adjacent wash road
  • Decommission and removal of existing equipment and wheel lathe
  • Excavation of concrete slab surrounding the sides of the pit and installation of propping system
  • Installation of reinforced concrete
  • Pumping arrangements were installed to remove any potential contaminated groundwater from the pit into existing drainage
  • Duct routes installed
  • Associated electrical works
  • A Frame heavy lift gantry crane installation
  • Installation of a new wheel lathe using a megalift system
  • Concrete floor painting works, grinding down of existing surface, 2 coats of non-slip floor paint with quartz sand were
  • Southern slab works; the existing slab was saw cut and
  • These works were completed over two phases